More tile was installed today. However, the tile supplier shorted us a couple boxes of tile. The extra coupel of boxes of tile will be delivered on Friday at noon. No worries, there is still plenty for Jim to do. Paul from Roper Electric will be back tomorrow for some more electrical work and Jim has lots of trim to install. I spent an hour or so in the garage buffing down all the wood trim with 000 grade steel wool to rub out all the "bumps" in the clearcoat. Look for photos showing the floor and Jim's progress in tomorrow's posting.
Wednesday, September 3, 2008